Malabar X Building Project

CWBW HOME            MALABAR HOME

 

 

The hull is faired and several coats of clear sealer have been applied.

 

 

 

 

 

 

This is a lodging knee made of Angelique.

 

 

 

 

 

 

A lodging knee in place helps to spread mast and rigging strains over a wider hull area.

 

 

Up forward a look at the breast hook which ties the stem to the sheer clamps.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


 

 


 

NEXT PAGE

CWBW HOME         MALABAR HOME

Keel/ballast    Transom    Molds in place    4     6    Interior frame    Deck beams   9   10    11  

12   Prep for caulk   The cockpit   15   Hull ready to paint   Preparing the mast   18   19   20 

  The trailer    Exiting the building    Launch Day   Sailing on Seneca Lake

 

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks