Malabar X Building Project

CWBW HOME            MALABAR HOME

 

 

Port garboard plank in place, the next strake is upside down in foreground.

 

 

 

 

 

Looking up at the planking coming down the hull

 

 

 

 

 

 

The end of the day, another plank in place.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

We custom fabricated these bronze floors where the bilge water will sit.

 

A close-up of the laminated

transom frame where all the

ribbands and planking end.

 


 

 

 

 

 

 

 

Looking from starboard to port inside

planking; notice the copper rivets.

 

 


 

NEXT PAGE

CWBW HOME         MALABAR HOME

Keel/ballast    Transom    Molds in place    First Sheer Plank    Putting planks in place    Final Planks    Interior frame    Deck beams   Lodging Knee    Aft Deck framing in place    Decking being sprung on   King Plank   Prep for caulk   The cockpit   Varnish   Cockpit scupper/Interior   Hull ready to paint   Preparing the mast    Finishing sanding the mast    Engine controls/The Bilge/Interior

  The trailer    Exiting the building    Launch Day   Sailing on Seneca Lake

 

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks