Malabar X Building Project

CWBW HOME            MALABAR HOME

 

The first sheer plank goes on the port side.

 

 

 

 

 

 

The first two planks go on and define the sheer.

 

 

 

 

 

 

The ribbands come off as the planking is put into place.

 

 

 

 

 

 

Looking up at the bow.

 



 

Here's a view from the deck edge looking down the ribs
toward the keel at the stainless steel strap floors.

 


 

NEXT PAGE

CWBW HOME         MALABAR HOME

Keel/ballast    Transom    Molds in place    First Sheer Plank    Putting planks in place    Final Planks    Interior frame    Deck beams   Lodging Knee    Aft Deck framing in place    Decking being sprung on   King Plank   Prep for caulk   The cockpit   Varnish   Cockpit scupper/Interior   Hull ready to paint   Preparing the mast    Finishing sanding the mast    Engine controls/The Bilge/Interior

  The trailer    Exiting the building    Launch Day   Sailing on Seneca Lake

 

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks