Her stern faces toward the exit.

 

 

Once the Malabar was finished the next feat was getting her out of the building after the 2 1/2 year building process. 

The trailer was constructed specifically to fit the Malabar.  As shown there are three sets of supports on each side, specially designed to allow the correct support and to remove it from the trailer for launch safely.

 

 

 

 

When the building process began the door (as seen left) was made large enough so that upon completion she could fit out through the opening.  Measurements had to be certain in order to allow the exit to go smoothly. 

 


 

NEXT PAGE

CWBW HOME         MALABAR HOME

Keel/ballast    Transom    Molds in place    First Sheer Plank    Putting planks in place    Final Planks    Interior frame    Deck beams   Lodging Knee    Aft Deck framing in place    Decking being sprung on   King Plank   Prep for caulk   The cockpit   Varnish   Cockpit scupper/Interior   Hull ready to paint   Preparing the mast    Finishing sanding the mast    Engine controls/The Bilge/Interior

  The trailer    Exiting the building    Launch Day   Sailing on Seneca Lake

 

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks