Dowager Restoration

CWBW HOME            DOWAGER HOME

 

New keel after being planed to thickness.

 

 

 

 

 

 

 

 

 

 

 

 

 
 

 

Keel with additional oak laminations being lowered from loft.

 

 

 

 

 

 

 

 

 

 

 

 
 

After another move to the shop below, rib pockets were cut and the keel put in place for a final check and fitting. It was then removed from the boat and painted with primer before being positioned and blocked in place for assembly.

 

 

With rib pockets completed, the new keel is fitted to the hull.

 

 

 

 

 

 

 

 

 

 

 

 

After painting, the new keel is blocked into place for assembly.

 

 

 

 

 

 

 

 


NEXT PAGE

CWBW HOME            DOWAGER HOME

 

 1    2    3     4     5    6    7    8    9    10   11   12   13   14   15   16   17   18    

 

Near Completion  Moving out of the shop  Ready to Launch  In the water

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks