Dowager Restoration

CWBW HOME            DOWAGER HOME

 

A view of completed scarf joints along with a few new planks.

 

 

 

 

 

The stem was removed taking care not to damage the topside plank ends.

 

 

 

 

 

 

 

 

 

 

 

 

A pattern was made to attain the proper shape for a new stem.

 

 

 

 

 

 

 

 

 

 

 

 

Justin Armstrong drives in a hand forged bronze through bolt.

 

 

 

 

 

 

 

 

 

 

This photo shows the new stem, knee, and the last dozen of the 132 new oak ribs.

 

 

 

 

 

Here blocks have been shaped and fastened to the ribs for use in fitting a garboard plank to the contour of the bottom.



 

 


 

NEXT PAGE

CWBW HOME            DOWAGER HOME

 1    2    3     4     5    6    7    8    9    10   11   12   13   14   15   16   17   18    

 

Near Completion  Moving out of the shop  Ready to Launch  In the water

 

 

Contact:
Dennis Montgomery

Cayuga Wooden Boatworks


800.570.5335


6301 Water St.
Cayuga, NY 13034
Voice: 315.253.7447

435 Taughannock Blvd.
Ithaca, NY 14850
Voice: 607.272.1581
Fax: 607.272.1601


Email: dennis@cayugawoodenboatworks.com

the Boatbuilding Ring - Click to Join
[ Prev ] [ Random ] [ List ] [ Next ]

 

 

Webmaster - Web Design & Mgt by ASN Designs

Copyright 2002-2004 Cayuga Wooden Boatworks